Customization: | Available |
---|---|
Standard: | GB, ASME |
Tolerance: | +/-0.10mm |
Still deciding? Get samples of US$ 700/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Item Name | sheet metal fabrication parts high quality OEM service laser cutting forming aluminum parts | |||||
Quality Assurance | ISO9001:2008 Certified | |||||
Main Equipment | Laser Cutting Machine/CNC Shearing Machine/Flat Bed Spot-welder/Die Grinder/Steel Processing Machine/Double Servo Turret-type Punch Press/Banding Machine/Steel Processing Machine/etc. | |||||
Materials | Aluminum Alloy:5052 /6061/ 6063 / 2017 / 7075 / etc. | |||||
Brass Alloy:3602 / 2604 / H59 / H62 / etc. | ||||||
Stainless Steel Alloy:303 / 304 / 316 / 412 / etc. | ||||||
Steel Alloy:Carbon Steel / Die Steel / etc. | ||||||
Other Special Materials: Lucite / Nylon / Bakelite / etc. | ||||||
We handle many other type of materials. Please contact us if your required material is not listed above. | ||||||
Surface Treatment | Blacking,polishing,anodize,chrome plating,zinc plating,nickel plating,tinting and so on | |||||
Testing equipment | CMM;Tool microscope;multi-joint arm;Automatic height gauge;Manual height gauge;Dial gauge;Marble platform;Roughness measurement | |||||
Service | OEM/ODM/Customized/Design | |||||
File Formats | Solid Works,Pro/Engineer, AutoCAD(DXF,DWG), PDF,TIF etc. | |||||
Packing | 1,With plastic bag,with pearl-cotton package. | |||||
2,To be packed in cartons. | ||||||
3,Use glues tape to seal cartons. |
1. What are your main products?
We specialize in manufacturing metal stamping die,metal stamping parts,sheet metal parts,cnc machining part and welding structural parts etc.
2. What is surface treatment do you have?
Powder coating, zinc plating, polished, paint, anodic oxidation etc.
3. Can I get the samples?
Yes, the sample is free, you only need to bear express shipping freight or we can send sample to you by your collect account.
4. What is the MOQ?
The MOQ is 500pcs for large parts, 1000pcs for small parts.
5. What's the delivery time?
In generally, it will take about 20- 25 days to finish one order.
6. What's your payment term?
30% down payment, 70% before shipment